久久99丝袜亚洲国产,亚洲欧美中文日本久久,久久精品国产亚洲欧美,久久国产日韩欧美激情

Chinese | Englih
Home >News

Hot press safety operation and maintenance procedures

Date:2019-3-1 10:47:09 Source: Popularity:

I. Operating procedures

1、Check whether the surface of the platen and the auxiliary laminate (high temperature mylar, etc.) is clean. If there is pieces of wood and dirt, clean them directly. Check whether the auxiliary laminate (high temperature mylar, etc.) is damaged, replace it immediately. Check the heating system of the press whether the heat conduction oil is sufficient. Oil with a depth of 2-5cm should be retained at the bottom of the expansion tank, otherwise it should be added timely.

2、Switch on the power, set the working temperature of the press according to the processing requirement. After this, turn on the circulating pump switch and heating control switch to start the press temperature control system.

    3、Remove the protective cover of the time relay panel for pressure holding and timing, and set the pressure holding time according to the processing requirement.

    4、 According to the workpiece area and required unit pressure(kg/c㎡), look up the biggest required force from the pressure curve on the hot press. Adjust the button of pressure controller, the red needle in the pressure controller dial is the upper limit pressure, while the black needle is the system working pressure. Adjust deasil, pressure setting decrease, adjust anticlockwise, setting increase.

    5、After finishing the setting, and the temperature reaches the setting point, workpieces can be processed.

    Put the workpieces on right position,see blew pictures;

    ①right position(width way)

         

  圖片1.png        圖片2.png

    圖片3.png      圖片4.png

                

                          

② right position(length way)

          

圖片5.png    圖片8.png

    圖片7.png    圖片6.png

          

6、If the workpiece is skewed in the press, please straightened with long wooden strip. The operator is not allowed to touch the platen and leave during press closing. The operator shall pay attention to the working condition of the equipment and the workpiece. In case of any abnormality, stop the closure immediately. It is strictly prohibited to touch the workpiece or the platen and the transmission part by hand during machine closing to prevent extrusion and scalding accidents

7、When finishing the pressure holding time, the press stop automatically, the platen will be lowered, take out the workpiece with a wooden strip

8、After finishing working, clean the platen surface, close the press without pressure. Turn off the heating system and main power until temperature of the press is below 60℃, clean up the working site.

II、Daily maintenance and standard

item

place

standard

time

  1

Hydraulic system

No leakage, suitable oil quantity

Check every shift and add oil in time

  2

Heating system

No leakage, suitable oil quantity

Check every shift and add oil in time

  3

platen

Clean, no dirt

Check every shift and clean up

  4

Synchronization system

Reliable and flexible

Check every shift and add grease every week


花莲市| 肥西县| 乌鲁木齐市| 武夷山市| 阳新县| 闵行区| 云南省| 乌审旗| 榆林市| 辽阳县| 郓城县| 托里县| 吉水县| 彩票| 白山市| 永和县| 延吉市| 高州市| 栖霞市| 文水县| 安阳市| 绥化市| 兴安盟| 蚌埠市| 韶山市| 中西区| 徐水县| 德化县| 河源市| 临夏县| 周至县| 虹口区| 灌云县| 屯昌县| 花莲县| 西畴县| 旅游| 常州市| 容城县| 天柱县| 德庆县|